 | North West Network NWLDZ |
02 Sep 09
-
01 Apr 10
| School Lane | O/S 275 CHESTER ROAD - CRN OF 108 SCHOOL LANE | LAY 1044.0M X 500MM PE OPEN CUT. ALL SERVICES ON ROUTE - ALLIANCE CONTACT JOHN TAYLOR | View |
 | North West Network NWLDZ |
19 Aug 09
-
19 Mar 10
| Chester Road | GLENWOOD RD - SUTTON WAY | ABANDON 628.5M X 10" SI. LAY 1,003M X 400MM PE OPEN CUT. ALL SERVICES ON ROUTE. | View |
 | North West Network NWLDZ |
01 Sep 09
-
01 Apr 10
| Chester Road Bypass | CNR 108 SCHOOL LANE - JNC WEAVER NAVIGATION | LAY 471.0M X 500MM PE OPEN CUT. ALL SERVICES ON ROUTE - ALLIANCE CONTACT E WORTH | View |
 | North West Network NWLDZ |
27 Aug 09
-
31 Mar 10
| Chester Road | OPP JCT COMPTON RD - OPP 131, 145A - OPP R/O 9 CLIFFORD RD. (SEE PORTAL) | ABN 184M X 12" CI. ABN 144M X 2" ST. ABN 20M X 4" CI. ABN 7M X 6" DI. ABN 566M X 9" CI. ABN 33M X 9" ST. LAY 7M X 125MM PE OPEN CUT. LAY 251M X 180MM PE INSERTION. LAY 270M X 213MM PE INSERTION. LAY 52M X 250MM PE INSERTION. LAY 133M X 280MM PE INSERTION. | View |
 | North West Network NWLDZ |
21 Sep 09
-
31 Mar 10
| Thornton Avenue | JNC CONGLETON RD - O/S 15. SIDE 3 - REAR 1. JNC CONGLETON RD (OPP SIDE) (portal) | ABANDON 533M X 8" SI. LAY 399M X 180MM PE INSERTION. 3M X 90MM, 134M X 250MM PE OPEN CUT. ALL SERVICES ON ROUTE. | View |
 | North West Network NWLDZ |
03 Dec 09
-
22 Mar 10
| Ullswater | O/S 61 THIRLMERE, XING THIRLMERE RD - O/S 82, RD XING O/S 82 - O/S 45, RD XING O/S 45 - O/S 66. 45-JNC RYDAL PLACE, INC | ABANDON 8M X 4", 389M X 6" DI. LAY 8M X 90MM, 389M X 125MM PE INSERTION. ALL SERVICES ON ROUTE. | View |
 | Capital Maintenance |
08 Oct 09
-
28 May 10
| Sandbach Road | Sandbach Road (A533) between High Gables and Thurlwood Farm | Laying of new 50mm pumping main in open cut in verge and crossing Sandbach Road between High Gables and Thurlwood Farm | View |
 | Capital Maintenance |
08 Oct 09
-
28 May 10
| Sandbach Road | Sandbach Road (A533) between High Gables and Thurlwood Farm | Laying of new 150mm gravity sewer and 50mm pumping main in open cut in verge and crossing Sandbach Road between High Gables and Thurlwood Farm. | View |
 | North West Network NWLDZ |
28 Sep 09
-
28 Apr 10
| Queensway | JUNCTION OF LOWER HAIGH STREET - JUNCTION OF WAYS GREEN | ABANDON 709M X 20" SI. LAY 709M X 355MM PE OPEN CUT. ALL SERVICES ON ROUTE. | View |
 | North West Network NWLDZ |
21 Dec 09
-
19 Mar 10
| Withyfold Drive | 32-JNC NICHOLSON AVE | ABANDON 160.3M X 4" CI. LAY 160.3M X 125MM PE OPEN CUT. ALL SERVICES ON ROUTE. | View |
 | North West Network NWLDZ |
21 Dec 09
-
19 Mar 10
| Garden Street | 93-75 BOTH SIDES OF ROAD. INC RD XINGS O/S 93 & 75 | ABANDON 73.2M X 2", 33M X 4", 28M X 6" CI. LAY 4.4M X 63MM PE INSERTION. 73.2M X 63MM, 56.6M X 180MM PE OPEN CUT. ALL SERVICES ON ROUTE. | View |
 | North West Network NWLDZ |
21 Dec 09
-
26 Mar 10
| Hurdsfield Road | OPP2-JNC LANSDOWNE ST. O/S 195-JNC TRINITY SQUARE. 203-O/S 277. SIDE 197-SID | OPP2-JNC LANSDOWNE ST. O/S 195-JNC TRINITY SQUARE. 203-O/S 277. SIDE 197-SIDE 45-O/S 49 SANDRINGHAM RD. RD XING O/S 277 - JNC DELAMERE DR. INC FEED JNC ARBOUHAY ST. Road xing from Delamere Drive across to gable of 277 Hurdsfield Rd | View |
 | North West Network NWLDZ |
21 Dec 09
-
19 Mar 10
| Nicholson Avenue | X JCT WITHYFOLD DR - O/S 31 | ABANDON 170.4M X 4" CI. LAY 169.4M X 180MM PE OPEN CUT. ALL SERVICES ON ROUTE. | View |
 | North West Network NWLDZ |
15 Dec 09
-
31 Mar 10
| Field Bank Road | JNC CHESTER RD (ODDS SIDES) - O/S 21. JNC CHESTER RD (EVENS SIDE) - O/S 34 | ABANDON 120M X 4", 171M X 6" CI. 102M X 2" ST. LAY 115M X 40MM, 120M X 75MM, 158M X 125MM PE INSERTION. 10M X 63MM PE OPEN CUT. ALL SERVICES ON ROUTE. | View |
 | North West Network NWLDZ |
19 Feb 10
-
18 Mar 10
| Wellington Road | OPP 53 TO O/S 68. R/O 66 TO R/O 44 WITH 2"ST INBETWEEN 58-60 AND 42-44. | LAY 30M X 280MMPE INS. 91M X 63MMPEO/C. ABANDON 30M X 12"CI. 28M X 3"CI. 129M X 2"ST. 10 POSSIBLE RENEWS EN ROUTE | View |
 | SPEN INVESTMENT DELIVERY ENGLAND |
04 Jan 10
-
28 May 10
| Bexton Lane | O/S KNUTSFORD GRID TO J/O TOFT ROAD | EXCAVATE/LAY 80M HV CABLE AND ROAD CROSSING. ALL WORKS DISCUSSED AND AGREED WITH ANDY WILSON. | View |
 | SPEN INVESTMENT DELIVERY ENGLAND |
04 Jan 10
-
28 May 10
| Toft Road | J/O BEXTON LANE UPTO J/O STOCKS LANE | EXCAVATE AND LAY 3900M HV CABLE, CONTINUES ONTO HOLMES CHAPEL ROAD. ALL WORKS DISCUSSED AND AGREED WITH ANDY WILSON. | View |
 | SPEN INVESTMENT DELIVERY ENGLAND |
04 Jan 10
-
28 May 10
| Holmes Chapel Road | TOFT ROAD UPTO J/O STOCKS LANE | EXCAVATE/LAY 3900M HV CABLE. CONTINUATION FROM TOFT ROAD. WORKS AGREED WITH ANDY WILSON. | View |
 | SPEN INVESTMENT DELIVERY ENGLAND |
04 Jan 10
-
28 May 10
| Stocks Lane | J/O HOLMES CHAPEL ROAD TO O/S RADBROKE HALL | EXCAVATE/LAY 190M HV CABLE. | View |
 | DINAS DEPOT |
09 Nov 09
-
30 Mar 10
| The Groves | O/S The Grosvenor Rowing Club | Install new CSO and related pipeworks | View |
 | North West Network NWLDZ |
08 Jan 10
-
19 Mar 10
| Becketts Lane | FROM HEATH LANE - JNC BELGRAVE RD. R/X 112 - O/S 45. | ABANDON 315.9M X 4", 108.2M X 6" SI. LAY 177.6M X 75MM, 223.3M X 90MM, 23.2M X 180MM PE INSERTION. ALL SERVICES ON ROUTE. | View |
 | North West Network NWLDZ |
18 Jan 10
-
24 Mar 10
| New Crane Street | CONN ONLY ICW WATERGATE STREET | CONN ONLY ICW WATERGATE STREET | View |
 | North West Network NWLDZ |
11 Jan 10
-
31 Mar 10
| Chiltern Avenue | JUNCTION IVY ROAD - JUNCTION SYCAMORE CRESCENT | ABANDON 280.6M X 4", 125.1M X 6" CI. 24.1M X 6" DI. LAY 85M X 90MM PE INSERTION. 65.1M X 125MM, 279.6M X 180MM PE OPEN CUT. ALL SERVICES ON ROUTE. | View |
 | North West Network NWLDZ |
26 Feb 10
-
15 Apr 10
| Prestbury Lane | ON BRIDGE JNC PRESTBURY LANE, BUTLEYS LANE & NEW ROAD | ABANDON 25M X 6"CI, LAY 25M X 180 LPPE, INS, RENEW/TRANSFER ANY SERVICES EN ROUTE. | View |
 | North West Network NWLDZ |
26 Feb 10
-
15 Apr 10
| Butley Lanes | ON BRIDGE JNC PRESTBURY LANE, BUTLEYS LANE & NEW ROAD | CONNECTION NOTICE ONLY IN RELATION TO WORK ON PRESTBURY LANE. | View |
 | North West Network NWLDZ |
26 Feb 10
-
15 Apr 10
| New Road | ON BRIDGE JNC PRESTBURY LANE, BUTLEYS LANE & NEW ROAD | CONNECTION NOTICE ONLY IN RELATION TO WORK ON PRESTBURY LANE. | View |
 | North West Network NWLDZ |
02 Feb 10
-
29 Mar 10
| Barkhill Road | FROM 19-JNC CRAITHIE RD. 23-JNC BUCKINGHAM AVE. BOTHSIDES BUCKINGHAM AVE- | ABANDON 47M X 4" DI. 526.9M X 4", 133.2M X 6" SI. 45.5M X 2" ST. LAY 45.5M X 40MM, 7.1M X 63MM, 573.8M X 75MM, 124.6M X 125MM PE INSERTION. ALL SERVICES ON ROUTE. | View |
 | North West Network NWLDZ |
29 Jan 10
-
13 Aug 10
| St Georges Road | OUTSIDE 86 - JUNCTION OF QUEENSWAY | ABANDON 10M X 15" SI. LAY 10M X 355MM PE OPEN CUT. ALL SERVICES ON ROUTE. | View |
 | SOUTH - CLEAN WATER MAJOR |
01 Mar 10
-
26 Mar 10
| Mere Heath Lane | JNC OF MERESIDE ROAD - 50M SOUTH OF MERE HEATH COTTAGE | WATER MAINS REHAB APPROX 100M O/C | View |
 | SOUTH - CLEAN WATER MAJOR |
01 Mar 10
-
26 Mar 10
| Mere Heath Lane | OPP 25 - 100 NORTH TOWARDS MERESIDE ROAD | WATER MAINS REHAB APPROX 100M O/C | View |
 | North West Network NWLDZ |
25 Jan 10
-
19 Mar 10
| Oldfield Drive | JCT GREEN LNE RD XING-THE MONSE-JCT VICARS CROSS RD,O/S 76-OPP55,RD XING-O/ | ABANDON 196.5M X 6" CI. 297.3M X 4", 257.7M X 6" SI. LAY 234.4M X 75MM, 62.9M X 90MM, 454.2M X 125MM PE INSERTION. ALL SERVICES ON ROUTE. | View |
 | North West Network NWLDZ |
08 Feb 10
-
23 Mar 10
| Coniston Way | O/S 39 THIRLMERE, XING THIRLMERE RD - SIDE 97 THORNTON AVE | ABANDON 154.3M X 4" SI. LAY 106.6M X 75MM PE INSERTION. 47.7M X 125MM PE OPEN CUT. ALL SERVICES ON ROUTE. | View |
 | United Utilites PLC - BBUSL - WASTE WATER MAJOR |
02 Feb 10
-
08 Apr 10
| Linley Road | FROM NO 8 TO NO 42 | OPENCUT 148 METRES. 148 M 450MM COMBINED SEWER. 4 NO NEW MANHOLES | View |
 | United Utilites PLC - BBUSL - WASTE WATER MAJOR |
02 Feb 10
-
07 May 10
| Linley Road | FROM JCT OF LINLEY ROAD TO NO 11 | TO FACILITATE CONSTRUCTION OF 10.3M DIAMETER DETENTION TANK | View |
 | United Utilites PLC - BBUSL - WASTE WATER MAJOR |
05 Feb 10
-
18 Mar 10
| Wayside | FROM NO 1 TO NO 9 | OPENCUT 30METERS. 30M 375MM COMBINED SEWER. 2 NO NEW MANHOLES | View |
 | United Utilites PLC - BBUSL - WASTE WATER MAJOR |
01 Mar 10
-
07 May 10
| Linley Grove | FROM NO 1 TO NO 51 | OPENCUT 160 METRES. 120M 525MM SURFACE WATER SEWER, 50M 675MM SURFACE WATER SEWER. 4 NO NEW MANHOLES | View |
 | United Utilites PLC - BBUSL- CLEAN WATER MAJOR |
22 Jan 10
-
22 Mar 10
| Chester Road | FROM O/S THE OUTLOOK TO JCT OF CHURCH STREET | SLIPLINE / PIM 6" AND 3" CAST IRON MAIN 140PE AND 90PE - MAIN AND THE F/WAY - O/C 100, PIM635, S/L 285 (METERES) SERVICES 54 | View |
 | North West Network NWLDZ |
27 Jan 10
-
31 Mar 10
| Hazlemere Avenue | RD XING 13 AMBERLEY RD - O/S 14. 14 - O/S 49 IVY LANE | ABANDON 114M X 4" CI. LAY 114M X 75MM PE INSERTION. ALL SERVICES ON ROUTE. | View |
 | North West Network NWLDZ |
08 Feb 10
-
31 Mar 10
| Larch Avenue | SIDE 25 - O/S 13 THORNTON AVE, XING THORNTON AVE RD | ABANDON 81.9M X 3" CI. 142.9M X 3", 38.2M X 4" SI. LAY 141.9M X 63MM, 38.2M X 75MM PE INSERTION. 83M X 90MM PE OPEN CUT. ALL SERVICES ON ROUTE. | View |
 | North West Network NWLDZ |
01 Feb 10
-
31 Mar 10
| Whalley Hayes | JNC CUMBERLAND ST - JNC WESTMINSTER RD | ABANDON 76.2M X 10" CI. 152.9M X 9" ST. LAY 193.5M X 250MM, 35.7M X 315MM PE OPEN CUT. ALL SERVICES ON ROUTE. | View |
 | North West Network NWLDZ |
19 Feb 10
-
25 Mar 10
| Hurdsfield Road | RD XING 237 - JCT HULLEY RD. NOTICE IN CONNECTION WITH MAINS RENEWAL ON HUL | ABN 13M X 6 | View |
 | North West Network NWLDZ |
19 Feb 10
-
25 Mar 10
| Hulley Road | S/O 240 HURDSFIELD RD - S/O 1 RAGLAN RD. RD XINGS OPP JCT RAGLAN RD & OPP 80. O/S S/O 27. S/O 32 - 30 & 44 ? 50 | ABANDON 9.6M X 6 | View |
 | North West Network NWLDZ |
18 Jan 10
-
24 Mar 10
| Watergate Street | JNC CITY WALLS ROAD - JNC LINEN HALL PLACE | ABANDON 5.8M X 4", 67.2M X 20" CI. 5.6M X 2" ST. LAY 5.8M X 75MM, 36.1M X 315MM, 31.2M X 450MM PE INSERTION. 6M X 63MM, 4M X 125MM PE OPEN CUT. ALL SERVICES ON ROUTE. | View |
 | North West Network NWLDZ |
19 Feb 10
-
18 Mar 10
| Craithie Road | FRM JNC BARKHILL RD TO O/S 54, FRM CNR OF 6 TO O/S 1= | ABANDON 44.7M X 4" CI. 151.5M X 4" SI. LAY 44.7M X 63MM, 151.5M X 75MM PE INSERTION. ALL SERVICES ON ROUTE. | View |
 | North West Network NWLDZ |
28 Jan 10
-
31 Mar 10
| Westminster Road | SIDE ROUNDABOUT - JNC KING EDWARD ST, INC RD XING JNC CUMBERLAND ST | ABANDON 10M X 8 | View |
 | North West Network NWLDZ |
01 Feb 10
-
08 Apr 10
| Cumberland Street | JNC PRESTBURY RD, XING RD O/S 1. JNC RISELY ST-O/S 150. JNC C/F | ABANDON 209.0M X 12" CI. 154.0M X 10", 125.0M X 12" DI. 9.0M X 3" ST. LAY 47.0M X 250MM, 334.0M X 280MM PE INSERTION. 9.0M X 125MM, 107.0M X 250MM PE OPEN CUT. ALL SERVICES ON ROUTE. | View |
 | North West Network NWLDZ |
12 Mar 10
-
25 Mar 10
| Rosslyn Road | JNC STUART CLOSE TO O/S 73 | ABANDON 84.2M X 4" SI. LAY 84.2M X 75MM PE INSERTION. ALL SERVICES ON ROUTE | View |
 | North West Network NWLDZ |
21 Jan 10
-
02 Apr 10
| New Crane Street | JNC CITY WALLS RD - OPP HOTEL(S/O RACE COURSE,WITHIN CAR PARK) | LAY 40M X 450MM, 159M X 500MM PE OPEN CUT. ALL SERVICES ON ROUTE. | View |
 | North West Network NWLDZ |
15 Feb 10
-
24 Mar 10
| Roewood Lane | SIDE 9 HURDSFIELD RD - O/S 62. O/S 1 - O/S 35, INC RD XING O/S 35. O/S 58 - O/S 82. | ABANDON 756M X 4", 132.2M X 6" CI. 17.9M X 2" ST. LAY 207.9M X 75MM, 270.1M X 90MM, 28.3M X 125MM PE INSERTION. 382M X 125MM PE OPEN CUT. ALL SERVICES ON ROUTE. | View |
 | North West Network NWLDZ |
19 Feb 10
-
19 Mar 10
| Hillfield Place | OPP 17 WELLINGTON ROAD TO OPP 50. | CONNECTION STREET ONLY | View |
 | North West Network NWLDZ |
19 Feb 10
-
19 Mar 10
| Parkfield Drive | OPP 17 WELLINGTON ROAD TO OPP 50. | CONNECTION STREET ONLY | View |
 | North West Network NWLDZ |
19 Feb 10
-
19 Mar 10
| Wellington Road | OPP 17 WELLINGTON ROAD TO OPP 50. | LAY 243M X 125MMPE INS. ABANDON 243M X 6"CI. 20 POSSIBLE RENEWS EN ROUTE | View |
 | North West Network NWLDZ |
19 Feb 10
-
19 Mar 10
| Wellington Road | OPP 17 WELLINGTON ROAD TO OPP 50. | LAY 243M X 125MMPE INS. ABANDON 243M X 6"CI. 20 POSSIBLE RENEWS EN ROUTE. | View |
 | North West Network NWLDZ |
19 Feb 10
-
19 Mar 10
| Hillfield Place | OPP 17 WELLINGTON ROAD TO OPP 50. | CONNECTION STREET ONLY. | View |
 | North West Network NWLDZ |
19 Feb 10
-
19 Mar 10
| Parkfield Drive | OPP 17 WELLINGTON ROAD TO OPP 50. | CONNECTION STREET ONLY | View |
 | DINAS DEPOT |
04 Feb 10
-
30 Apr 10
| Dee Lane | Dee Lane, Chester | Retrofitting of screen and repairs to outfall | View |
 | North West Network NWLDZ |
08 Mar 10
-
19 Mar 10
| Queens Road | JNC GREEN LANE TO O/S 108 | ABANDON 74.6M X 6" CI. 87.2M X 6" SI. LAY 161.8M X 125MM PE INSERTION. ALL SERVICES ON ROUTE. | View |
 | North West Network NWLDZ |
05 Mar 10
-
01 Apr 10
| Prestbury Road | O/S 62 - O/S 17. | ABANDON 170.0M X 6" CI. LAY 170.0M X 125MM PE INSERTION. ALL SERVICES ON ROUTE. | View |
 | North West Network NWLDZ |
01 Feb 10
-
31 Mar 10
| Cumberland Street | REAR 62 PRESTBURY RD - S/O 71 PRESTBURY RD - REAR OF WILLERBY HOUSE. | ABANDON 48.4M X 6" DI. LAY 48.4M X 125MM PE INSERTION. ALL SERVICES ON ROUTE. | View |
 | North West Network NWLDZ |
09 Mar 10
-
22 Mar 10
| Hawthorn Road | O/S 10 - CNR 4. R/X 3. | ABANDON 37.8M X 2" ST. LAY 37.8M X 40MM PE INSERTION. ALL SERVICES ON ROUTE. | View |
 | North West Network NWLDZ |
11 Mar 10
-
25 Mar 10
| Hillside Drive | X JCT SPRINGHILL - 25. O/S 16 -20 RD XING 25 - 18. S/O 11 & 13 - BEARDA HILL | ABN 22M X 2" CI. ABN 65M X 2" ST. ABN 147M X 4" CI. LAY 91M X 40MM PE INSERTION. LAY 141M X 75MM PE INSERTION. AND ALL SERVICES ON ROUTE. | View |
 | North West Network NWLDZ |
11 Mar 10
-
19 Mar 10
| Spring Hill | S/O 11 HILLSIDE CRT TO O/S 6/8 FULL LENGTH | ABANDON 121.2M X 4" SI. LAY 121.2M X 75MM PE INSERTION. ALL SERVICES ON ROUTE. | View |
 | North West Network NWLDZ |
08 Mar 10
-
23 Mar 10
| Jordangate | OPP 20 - O/S GEORGE HOTEL | ABANDON 69.9M X 12" CI. 14.1M X 12" DI. LAY 83.9M X 280MM PE INSERTION. ALL SERVICES ON ROUTE. | View |
 | North West Network NWLDZ |
08 Mar 10
-
19 Mar 10
| Pownall Street | S/O 35 CUMBERLAND ST - S/O 21 POWNALL ST | ABANDON 52.7M X 4" ST. LAY 52.7M X 125MM PE OPEN CUT. ALL SERVICES ON ROUTE. | View |
 | North West Network NWLDZ |
10 Mar 10
-
23 Mar 10
| Thackeray Drive | O/S 34 OLDFIELD DR - O/S 10. OPP 12 - CNR OF NEXUS HOUSE. CNR OF 88 GREEN LANE. | ABANDON 4.4M X 4" CI. 87.3M X 4" SI. LAY 74.5M X 75MM, 17.2M X 90MM PE INSERTION. ALL SERVICES ON ROUTE. | View |
 | North West Network NWLDZ |
09 Mar 10
-
22 Mar 10
| Bythom Close | FROM O/S 2 - 5. | ABANDON 87.7M X 3" SI. LAY 87.7M X 63MM PE INSERTION. ALL SERVICES ON ROUTE. | View |
 | North West Network NWLDZ |
10 Mar 10
-
30 Mar 10
| Heath Lane | CNR 74 TO CNR 103. | ABANDON 68.1M X 3", 139.7M X 4" CI. LAY 68.1M X 63MM, 139.7M X 75MM PE INSERTION. ALL SERVICES ON ROUTE. | View |
 | North West Network NWLDZ |
25 Feb 10
-
17 Mar 10
| Langport Drive | BETWEEN 95 & 97 OLDFIELD DRIVE ROAD XING TO LANGPORT DRIVE FULL LENGTH | ABANDON 129.1M X 4" SI. LAY 129.1M X 75MM PE INSERTION. ALL SERVICES ON ROUTE. | View |
 | North West Network NWLDZ |
18 Feb 10
-
17 Mar 10
| Boughton Hall Drive | MANOR DR ALONGSIDE ODD SIDE OF ST-O/S 1. FROM O/S 1 RX-62 JNC MOORCROFT AVE | ABANDON 100.4M X 4" SI. 14.9M X 3", 338M X 4" ST. LAY 14.9M X 63MM, 438.4M X 75MM PE INSERTION. ALL SERVICES ON ROUTE. | View |
 | North West Network NWLDZ |
11 Mar 10
-
15 Apr 10
| Rossmore Gardens | REAR 7 COOMBE PARK ALONG S/O RAILWAY LINE TO REAR 89 HAWTHORN ROAD. | ABANDON 140M X 10" CI. ALL SERVICES ON ROUTE. | View |
 | North West Network NWLDZ |
28 Jan 10
-
31 Mar 10
| Westminster Road | JCT CUMBERLAND ST - JCT COARE ST. S/O SUPERSTORE - S/O WESTBROOK DR | ABANDON 140.7M X 4", 208.5M X 9" CI. LAY 80.7M X 63MM, 111.3M X 250MM PE INSERTION. 10M X 90MM, 97.2M X 250MM PE OPEN CUT. ALL SERVICES ON ROUTE. | View |
 | SP CUS LICENSED WORK |
04 Jan 10
-
28 May 10
| Toft Road | from beggermans lane to holmes chapel rd through to stocks lane | EXCAVATION OF A LARGE JOINT BAY AND APPROXIMATELY 3900 METRES OF TRENCH FOR AN ELECTRIC MAINS CONNECTION. works originally submitted by sp reference on gy00384638a. changed notice as core now doing the work | View |
 | SP CUS LICENSED WORK |
04 Jan 10
-
28 May 10
| Holmes Chapel Road | from Begegrmans lane on toft road upto stocks lane | EXCAVATION OF A LARGE JOINT BAY AND APPROXIMATELY 3900 METRES OF TRENCH FOR AN ELECTRIC MAINS CONNECTION. originally submitted by sp but core will now complete the works | View |
 | West Midlands Network WMLDZ |
05 Jan 10
-
18 Mar 10
| Canal Road | POSITION O/S NO. 100 TO A POSITION OUTSIDE PROPERTY NAMES ROSEMEDE | LAY 173M X 180MM PE LOW PRESSURE MAIN BY DEAD INSERTION AND OPEN CUT TECHNIQUES, MAKE CONNECTIONS AND ABANDON 173M X 9" CI AND 15M X 2" STEEL LP MAIN. RELAY / TRANSFER 18 SERVICES. | View |
 | West Midlands Network WMLDZ |
19 Feb 10
-
22 Apr 10
| Harvey Road | JUNCT OF ST JOHNS ROAD TO O/S NO 93 HARVEY RD/2 ROAD CROSSINGS O/S 35 & 39 | 514M 100MM DI ABN, 191M 6" SI ABN, 117M 8" SI ABN, 13 DOMSERV T/F, 311M 125MM DEAD INSRT, 21M 75MM DEAD INSRT, 495M 90MM DEAD INSRT IN F/W, C/W & VERGE, 66 QUANTITY MP CONNECTIONS, | View |
 | West Midlands Network WMLDZ |
17 Feb 10
-
05 May 10
| Sandbach Road | BOX LANE TO ADJACENT TO NO 24 SANDBACH ROAD DOWN BOTH SIDES IN PLACES | 26M 10" CI,165M 10" SI,32M 100MM DI,26M 2" ST,198M 4" CI,449M 4" SI , 233M 6" CI ABN, 49 DOMSERV RENEW,11 DOMSERV T/F,234M 125MM DI,190M 180MM DI,59M 63MM DEAD INSRT,49M 63MM O/C/296M 90MM DEAD INSRT, | View |
 | North West Network NWLDZ |
03 Mar 10
-
30 Mar 10
| Caldy Valley Road | REAR OF 8 BUTTER BUR CLOSE - JNC CHESTER RD | ABANDON 213.9M X 8" DI. 170M X 8" PE. LAY 383.9M X 250MM PE OPEN CUT. ALL SERVICES ON ROUTE. | View |
 | United Utilites PLC - BBUSL - WASTE WATER MAJOR |
02 Feb 10
-
06 Jul 10
| Booth Lane | FROM NO 102 TO NO 216 | OPENCUT EXCAVATION 860 METRES. 400M X 450MM FOUL SEWER AND 460M X 750MM SURFACE SEWER | View |
 | North West Network NWLDZ |
05 Mar 10
-
16 Mar 10
| Chester Road | JNC - ROUNDABOUT | ABN 20M X 4" CI. ABN 11M X 9" ST. LAY 11M X 125MM PE INSERTION. LAY 20M X 75MM PE INSERTION. AND ALL SERVICES ON ROUTE. | View |
 | North West Network NWLDZ |
24 Feb 10
-
26 Mar 10
| Higher Fence Road | JUNCTION COTTAGE LANE - REAR OF GREENWAYS. JUNCTION HIGHER FENCE ROAD | ABN 225M X 4" CI. LAY 85M X 125MM PE OPEN CUT. LAY 141M X 90MM PE INSERTION. AND ALL SERVICES ON ROUTE. | View |
 | North West Network NWLDZ |
24 Feb 10
-
26 Mar 10
| Pine Close | O/S 18 PINE RD, XING PINE RD - O/S 15/12 | ABANDON 16.8M X 2", 75.8M X 4" CI. LAY 16.8M X 40MM, 75.8M X 63MM PE INSERTION. ALL SERVICES ON ROUTE. | View |
 | North West Network NWLDZ |
24 Feb 10
-
26 Mar 10
| Pine Road | JNC HIGHER FENCE RD - O/S 36/25 | ABANDON 59.7M X 3", 111.6M X 4" CI. 15.5M X 2" ST. LAY 15.5M X 40MM, 59.7M X 63MM, 111.6M X 90MM PE INSERTION. ALL SERVICES ON ROUTE. | View |
 | United Utilites PLC - Enterprise - Clean Water Min |
12 Jan 10
-
20 Oct 10
| Valebrook Drive | 2 | REPLACE BROKEN STOP TAP CAUSING NO WATER | View |
 | North West Network NWLDZ |
05 Mar 10
-
01 Apr 10
| Crompton Road | S/O 339 PARK LANE - 197. O/S 95 - 191, 55 - 89. S/O 83 CHESTER RD - JCT PWNALL SQ | ABANDON 662.1M X 6" CI. 17.3M X 6" DI. 7.9M X 1" ST. LAY 245.7M X 125MM, 258.6M X 140MM PE INSERTION. 169.1M X 180MM PE OPEN CUT. ALL SERVICES ON ROUTE. | View |
 | North West Network NWLDZ |
26 Feb 10
-
18 Mar 10
| Oxford Road | OPP 271 - O/S 148B | ABANDON 223.5M X 6" CI. LAY 223.5M X 125MM PE INSERTION. ALL SERVICES ON ROUTE. | View |
 | North West Network NWLDZ |
12 Feb 10
-
22 Mar 10
| Thirlmere | O/S 71 - 61 | ABANDON 37.5M X 4" CI. LAY 37.5M X 125MM PE OPEN CUT. ALL SERVICES ON ROUTE. | View |
 | North West Network NWLDZ |
15 Jan 10
-
16 Mar 10
| Knutsford Road | 59 KNUTSFORD ROAD o/s 59 | Trace, then excavate to repair gas escape and reinstate where possible | View |
 | West Midlands Network WMLDZ |
17 Feb 10
-
28 Apr 10
| Reades Lane | FROM THE JUNCTION OF WARDS LANE TO O/S THE COACH & HORSES PH | 626M 4" CI ABN, 34 DOMESTIC SERVICE RENEWS, 6 DOMESTIC SERVICE TRANSFERS , 626M 90MM DEAD INSERT IN FOOTPATH, CARRIAGEWAY AND VERGE, 19 NONDOM RENEW. | View |
 | United Utilites PLC - BBUSL- CLEAN WATER MAJOR |
08 Feb 10
-
19 Mar 10
| Marsh Green Road | OPPOSITE 60 TO JCT EVA STREET | TO OPENCUT AND LAY 450MM PIPE IN CARRIAGEWAY. 165 METERS OF OPENCUT | View |
 | United Utilites PLC - BBUSL- CLEAN WATER MAJOR |
08 Feb 10
-
19 Mar 10
| Eva Street | JCT MARSH GREEN ROAD TO SIDE OF 28B MARSH GREEN ROAD | TO OPENCUT AND LAY 450MM PIPE IN CARRIAGEWAY. 30 METERS OF OPENCUT | View |
 | United Utilites PLC - Enterprise - Clean Water Min |
23 Jan 10
-
19 Mar 10
| Church Lane | WARREN FARM DIG IN FOOTWAY | REPAIR LEAKING MAIN | View |
 | North West Network NWLDZ |
24 Jan 10
-
17 Mar 10
| Congleton Road | 76 CONGLETON ROAD 1 thornton ave | Trace, then excavate to repair gas escape and reinstate where possible | View |
 | North West Network NWLDZ |
29 Jan 10
-
31 Mar 10
| Valley Road | O/S 12 - 46 IVY LANE | ABANDON 95.5M X 8" CI. LAY 95.5M X 180MM PE INSERTION. ALL SERVICES ON ROUTE. | View |
 | North West Network NWLDZ |
29 Jan 10
-
31 Mar 10
| Ivy Lane | JNC CONGLETON RD - JNC IVY RD. O/S 2 - O/S 70. INC RD XINGS 19 | ABANDON 651M X 4", 666M X 8", 78M X 9" CI. LAY 652M X 75MM, 13M X 90MM, 653M X 180MM, 69M X 213MM PE INSERTION. ALL SERVICES ON ROUTE. | View |
 | SP CUS LICENSED WORK |
09 Mar 10
-
22 Mar 10
| Road One | OS SUB AND OPP MERIDIAN HOUSE | EXCAVATION OF A LARGE JOINT BAY AND APPROXIMATELY 2 METRES OF TRENCH FOR AN ELECTRIC MAINS CONNECTION. | View |
 | North West Network NWLDZ |
27 Jan 10
-
16 Mar 10
| Towers Road | 58 TOWERS ROAD towers cottage towers rd | Trace, then excavate to repair gas escape and reinstate where possible | View |
 | United Utilites PLC - BBUSL- CLEAN WATER MAJOR |
28 Jan 10
-
25 Mar 10
| Plumley Moor Road | JCT CHESTER ROAD TO JCT TROUTHALL LANE | 6 TRIAL HOLES AND OPENCUT 875 METERS X 160MM MAIN IN CARRIAGEWAY AND RENEW 13 SERVICES. TWO WAY TEMP TRAFFIC LIGHTS (PREMIER TRAFFIC MANAGEMENT) AND CHAPTER 8 | View |
 | North West Network NWLDZ |
01 Feb 10
-
31 Mar 10
| King Edward Street | JNC WESTMINSTER ROAD | CONNECTION ONLY IN CONJUNCTION WITH MAINS RENEWAL ON WESTMINSTER ROAD | View |
 | North West Network NWLDZ |
01 Feb 10
-
31 Mar 10
| Hibel Road | JNC CUMBERLAND (S/O 38 CUMBERLAND ST) | CONN ONLY MAINS RENEWAL IN CONJUNCTION WITH CUMBERLAND STREET | View |
 | North West Network NWLDZ |
01 Feb 10
-
31 Mar 10
| Sunningdale Road | S/O 11 CHILTERN AVE | CONNECTION ONLY IN CONJUCNTION WITH MAINS RENEWAL WORK ON CHILTERN AVENUE | View |